The nZEB standard is won or lost at the envelope stage. We built the timber structure with our own carpenters, and the insulation, vapour barriers and air-tightness were checked stage by stage, before the walls were closed.

Electrical, plumbing and heating services were routed through the structure before boarding — a stage where a mistake cannot be corrected later without dismantling. The photograph in the gallery captures exactly that moment in the build.

The facade was clad in metal panels on a ventilated frame, installed from scaffolding, and the interior finishes were carried out entirely by our own crews.

From the site

Mănăstirea Cașin, Bacău County

The completed house — facade clad in metal panels on a ventilated frame. · Facade cladding under way, installed from scaffolding. · Services routed through the timber structure before the walls are closed.

Projects in this category

Iulius Mall retail complexes

Suceava and Timișoara

Foundations, steel structures, partitioning and cladding, delivered as subcontractor on the construction and extension of the complexes.

  • Subcontract
  • Steel structures
  • Retail
  • Foundations

Have a project to start? Tell us what it involves.

We respond to quote requests for civil construction, industrial work, energy-efficient houses and refurbishment. If a project falls outside our competence, we say so at the outset.

Head office Str. Dr. Victor Babeș, Nr. 7, 601140 Onești
Phone 0749 065 522